Titas Gas Transmission and Distribution PLC has resumed gas supply to pipelines in the Mirpur Road area after replacing a ruptured valve.

However, it may take several more hours for low pressure conditions to ease, with normal flow expected to return gradually as pressure builds up.

The company said this in a statement issued on Saturday afternoon.

Valves regulate the flow of pipeline gas and allow supply to be increased or reduced when necessary. They are installed at specific points along distribution lines.

Dhaka has been facing a liquefied petroleum gas (LPG) shortage for the past two weeks.

Meanwhile, since a pipeline leak in Aminbazar on 4 January, residents have been receiving gas at low pressure for about a week, causing widespread inconvenience.

The situation worsened again on Saturday following a fresh incident. In a morning notice, Titas said a four-inch valve burst in front of Ganabhaban on Mirpur Road, creating a leak.



Contact
reader@banginews.com

Bangi News app আপনাকে দিবে এক অভাবনীয় অভিজ্ঞতা যা আপনি কাগজের সংবাদপত্রে পাবেন না। আপনি শুধু খবর পড়বেন তাই নয়, আপনি পঞ্চ ইন্দ্রিয় দিয়ে উপভোগও করবেন। বিশ্বাস না হলে আজই ডাউনলোড করুন। এটি সম্পূর্ণ ফ্রি।

Follow @banginews